CUSTOM FABRICATED BENDS,
SALINE CREEK
Location: Wood Buffalo, AB
Engineer: Associated Engineering
Contractor: EMCO WW #710 Fort McMurray
• 45º bend with 1.5m stub
• Steel transition to PVC
• M11 restraints
• AWWA C213 coating
Project Notes:
45 degree bend spool made from carbon steel coated to AWWA and NSF standards transitions into a 1.5 m PVC stub that gets connected to system in place. The modified M11 restraints allow connection to PVC restrainers.