Location: Surrey, BC
Engineer: Associated Engineering
Contractor: Merletti Construction
The isolation valve(in Red) and the dismantling joint (in green) tie into the valve chamber. This system was restrained by pouring concrete in the sandbag pocket and the space built just next to the chamber. Tie rods through the lugs demonstrate the restraining set-up.